top of page
102020-Brossard-web.jpg

THE PROJECT:
PANAMA BUS TERMINAL
CASE STUDY

Retention of 1000m³ of stormwater for a bus parking lot.

IMPORTANT PROJECT CONSIDERATIONS

Initial Specification 

The original specified product was an arch retention system comprised of 2 basins for a total volume of 1,168 m2

Initial specified product:
Arch retention system

1,168 m2

ORIGINAL PROPPSAL-01.png

Proposed Solution:
EZStorm Basin

868 m2

EZSTORM-01.png

After careful review, NouVLR selected EZStorm for their waterstorm retention system.

 

The EZStorm high-capacity structure was installed, allowing the construction of a parking lot for light and heavy vehicles.

Construction savings
breakdown

FOOTPRINT

26% smaller footprint than arches solution

​

EXCAVATION
35%
reduction of excavation volume 

SAVINGS: $10,000 

 

BACKFILL 
70 % reduction of backfill volume

SAVINGS: $8,000 

 

STONE
100% crushed stone cost reduction (not required with EZStorm)

SAVINGS: up to $46,000 

​

GEOTEXTILE
50% reduction of required geotextile

SAVINGS: up to $6,000

​

SOIL DECONTAMINATION
35% reduction of excavation costs significantly reduced the cost of soil decontamination

SAVINGS: up to $100,000

​

​

TOTAL SAVINGS: $170,000

bottom of page